Skip to content

Revision cycle successfully closed by TAL, according to Lenting's announcement

Final Tank Resumes Operations, Finalizing the Ongoing Maintenance Phase; Seven Tanks in Operation. Site: Lenting, Germany. Timestamp: August 13, 2025.

Successful Completion of Revision Cycle by TAL
Successful Completion of Revision Cycle by TAL

Revision cycle successfully closed by TAL, according to Lenting's announcement

The oil industry giant, Deutsche Transalpine Oelleitung GmbH (TAL), has resumed operation of the last oil tank at its Lenting site on August 13, 2025. This marks the completion of the current maintenance cycle for all seven tanks at the site.

Tank 6, with a diameter of 58.5 meters and a height of 18 meters, underwent a comprehensive maintenance process that included emptying, cleaning, and internal inspection. Specialists and geologists from TÜV conducted the inspection and reinforced Tank 6 for the next 15 years.

The maintenance work on Tank 6 also involved the installation of a tertiary seal, reducing steam emissions by 99.8 percent. Large cranes and suction vehicles were used during the final stages of maintenance work.

Although the press release does not provide specific details about the downtime and circumstances of Tank 6's resumption, it is clear that the maintenance process was carried out diligently, with a strong emphasis on precision and safety.

During the refilling of Tank 6, hydrocarbons will be sucked up and passed through a combustion chamber. A brief odor phase during tank inflation cannot be completely ruled out in the coming week. However, the press release does not mention any impact on oil prices or supply.

It is worth noting that the location and type of oil tank mentioned in the press release are not specified. The press release also does not name the company or organization responsible for the oil tank, beyond stating that the commissioning of Tank 6 was done by Press Office/HEINRICH GmbH.

This news serves as a testament to TAL's commitment to maintaining its infrastructure and ensuring the safe and efficient operation of its oil tanks. The resumption of Tank 6's operation brings the Lenting site one step closer to its full operational capacity.

The comprehensive maintenance process on Tank 6, a significant part of the oil-and-gas industry operated by Deutsche Transalpine Oelleitung GmbH (TAL), involved finance for the material and labor costs, as well as energy for the machinery used in the maintenance and refilling process. The resumption of Tank 6's operation, following the maintenance cycle, is a crucial step in the company's continued operation in the finance and energy sectors, particularly the oil-and-gas industry.

Read also:

    Latest