Bicycle Path in Seligenstadt Reopens After Renovation: Project Completion Achieved
Seligenstadt's Main Cycle Path Shines Brighter Than Ever 🌞
Spring's here, and Seligenstadt's got some sweet news for cyclists! The Main cycle path, running from Mainring to the Schleifbach bridge, has been fully remodeled, giving it a beautiful facelift 🤩. City officials confirmed the construction's completion on April 23, 2025, aiming to boost traffic safety and cater to the growing needs of daily and leisure traffic.
Time to bid farewell to those pesky potholes 🚫
Before the renovation, the cycle path was a rough ride, with potholes, cracks, stone disintegration, and deformations causing major headaches for cyclists and pedestrians 🤕. But now, with a 4-centimeter-thick asphalt surface layer, a 10-centimeter-thick asphalt base layer, and around a 10-centimeter-thick gravel base layer for stabilization and leveling, you can glide along the revamped path like a pro