Skip to content

A segment of the A8 highway temporarily shut down during July weekends

Scheduled bridge demolition activities ahead in Stuttgart, leading to traffic detours

Roadway segment A8 will have temporary shutdown in July for duration of weekend.
Roadway segment A8 will have temporary shutdown in July for duration of weekend.

A segment of the A8 highway temporarily shut down during July weekends

In July 2025, motorists travelling towards Stuttgart on the A8 motorway near Pforzheim should be aware of upcoming changes due to the demolition of two bridges as part of the A8 motorway expansion. The A8 will be fully closed between the Pforzheim-South and Pforzheim-North junctions during the demolition, which is scheduled to start on Friday, July 12 at 10 PM and last until Monday morning, July 15 at 5 AM.

Regional traffic will be rerouted via the signposted detours U7a and U9 to the Pforzheim-South junction on the A8 during the closure in the direction of Stuttgart. Simultaneously, repairs are being carried out on the B10, which will be closed to traffic from 8 PM on July 12 until 5 AM on July 15. The signposted detour during the B10 closure will run in both directions via Niefern-Vorort and Pforzheim-Eutingen.

Long-distance traffic between the Leonberg motorway junction and the Walldorf motorway interchange will be rerouted via the A81 and A6. It is important to note that in the direction of Karlsruhe, the A8 will remain open during the demolition and B10 repair works.

The Baden-Württemberg traffic authority, the German Federal Highway Research Institute (BASt), or the Autobahn GmbH website are the best sources for precise details on the exact dates, scope, and recommended detours for the July 2025 works. These organisations typically publish advance notices, including maps and instructions for affected motorists.

The A8 motorway expansion near Pforzheim also involves simultaneous repairs to the B10, which are being carried out by the Southwest branch of the Autobahn GmbH. The repairs to the B10 and the demolition works are being done to maximize efficiency and minimise disruption.

For those planning travel in the area during this time, it is strongly recommended to check official sources for the most accurate and up-to-date information on detours and closures.

The upcoming A8 motorway expansion near Pforzheim includes industry-related activities such as the demolition of two bridges and concurrent repairs on the B10, which is a part of the finance sector and transportation infrastructure. The automotive industry might also be impacted, as motorists may be rerouted to detours, causing possible delays in long-distance transportation.

Read also:

    Latest