Skip to content

A new bypass in Prachin Buri designed to reduce traffic congestion

Fresh passageway in Prachin Buri now open, administered by the Department of Rural Roads (DRR), designed to alleviate city traffic jams and foster economic development in the area. The newly constructed road connects Highway 3452 to Ban Sang intersection in Ban Sang district of this eastern...

A new bypass in Prachin Buri designed to reduce traffic congestion

The newly constructed bypass road in Prachin Buri, a game-changer for urban traffic and regional development, has officially seen the light of day. Built by the Department of Rural Roads (DRR), this badass highway links Highway 3452 to Ban Sang intersection in Ban Sang district, offering a much-needed detour for travelers trying to escape the congested city center of Prachin Buri.

As explained by Deputy Prime Minister and Minister of Transport Suriya Jungrungreangkit, this road will be a traffic-busting, public-pleasing marvel that slices through the urban gridlock and makes life a whole lot easier. "This highway is gonna be the crown jewel of our infrastructure," he declared. "It's gonna make traversing the districts between Ban Sang, Muang, Si Maha Phot, and Prachantakham a breeze, giving folks an alternative route to bypass the rat race in the city center."

Not only will this road bring a sense of peace to the urban area, it's also a key infrastructure piece in driving trade, tourism, and investment. It'll act as a linchpin in the logistics network linked to the Indochina corridor, ready to rumble like a well-oiled machine.

Now, let's dive into the gory details: the highway is divided into two sections, each with its own specific set of features. Section I, a 7.2 km beast, spans from tambon Bang Boriboon to tambon Bang Decha in Muang district and boasts 2 to 4 asphalt lanes, reinforced concrete intersections, 7 reinforced concrete bridges, and all the knick-knacks like lighting, drainage systems, traffic signals, and safety facilities. And the cost? A cool 899.99 million baht.

Section II, beginning where Section I ends, stretches 18.45 kilometres through Ban Sang district and comes packed with 2 to 4 asphalt lanes, 5 reinforced concrete bridges, and the full shebang of lighting and drainage infrastructure. The total investment for this section stands at 900 million baht.

All told, this 25.65-kilometer superhighway serves as more than just a strategic detour: it's lending a hand to the Eastern Economic Corridor (EEC) initiative, bolstering the region's competitive edge, and aiding in the transportation of industrial and agricultural goods towards Cambodia and the Indochina region.

To top it off, the road's savvy design supports the Bang Tan Royal Development Project, an integrated agricultural learning center in Ban Sang district, making it even more valuable to the area.

So there you have it: open for business and ready to bear the brunt of urban traffic, this badass highway is a welcome addition to Prachin Buri's infrastructure and a promising catalyst for the city's future growth and development.

*Enrichment Insights:*

  • The new bypass road in Prachin Buri is a significant investment in infrastructure and sustainable development, with an estimated total cost of 1,799.99 million baht.
  • By providing an alternative to congested city centers, the bypass is expected to improve traffic flow, reduce congestion, and enhance convenience for commuters.
  • The road serves as a vital link in the Indochina corridor, facilitating trade, tourism, and investment, while strengthening logistics networks.
  • The improved transportation infrastructure is likely to attract businesses and investors, leading to increased economic activity and job creation in the area.
  • The construction of the bypass road supports regional development by promoting urban expansion and agricultural development outside the city center, and by connecting key districts and improving accessibility in eastern Prachin Buri, thus fostering balanced growth and development in the region.

The newly constructed bypass road in Prachin Buri, a significant investment in infrastructure and sustainable development, will boost the region's finance sector by attracting industrial and agricultural businesses and investors. This transportation solution, linking key districts, will play a pivotal role in the Indochina corridor's logistics network, bridging the gap for finance and trade between Prachin Buri and neighboring regions.

A newly constructed diversion route, aimed at alleviating city traffic jams and stimulating local economic expansion, has been launched in Prachin Buri. This road, developed by the Department of Rural Roads (DRR), links Highway 3452 to Ban Sang intersection, specifically in the Ban Sang district of this eastern province.

Read also:

    Latest